home *** CD-ROM | disk | FTP | other *** search
/ The PC-SIG Library 10 / The PC-Sig Library - Shareware for the IBM PC and Compatibles (PC-SIG)(Tenth Edition Disks 1-2804)(1991).iso / PC_SIGCD / 11 / 0 / DISK1105.ZIP / DATA / P1984.F01 < prev    next >
Text File  |  1988-06-01  |  2KB  |  45 lines

  1. df=vl.e34
  2. d2=t$.e80
  3. d3=t4/3.0
  4.  
  5.       A.B.C. Chemical COMPANY                    todays date: |today |
  6.  
  7.       cost summary report    PLAN:|plan| scenario:|sn|
  8.       
  9.       demonstration:         lubricating oil plant optimization
  10.  
  11.       scenario: |title                                                       |
  12.  
  13.      cost(minimized): |optimal=t$.e42   |   infeasibility: |inf=t$.e34|
  14.        analysis date: |sndate|                      count: |inf=vl|
  15.                 time: |sntime|
  16.  
  17.     plant #1 cost summary        oil costs       op. costs       total cost
  18.  
  19. d10 & d30   |#100@10.t1| mbl |#100@10.d2.t2 | |#11@10.d2.t3| |fn=(f2+f3).d2.t4|
  20. d30 & d60   |#100@11.t1| mbl |#100@11.d2.t2 | |#11@11.d2.t3| |fn=(f2+f3).d2.t4|
  21. d10 & d60   |#100@12.t1| mbl |#100@12.d2.t2 | |#11@12.d2.t3| |fn=(f2+f3).d2.t4|
  22.  
  23.     ---------------------------------------------------------------------------
  24. totals      |t1        | mbl |t2            | |t3          | |t4              |
  25.  
  26.  
  27.     plant #2 cost summary       plt #1 cost   plt #2 op. cost    total cost
  28.  
  29. m10 product |#510.t6   | mbl |fn=d3.d2.t7   | |#21@20.d2.t8| |fn=(f2+f3).d2.t9|
  30. m30 product |#530.t6   | mbl |fn=d3.d2.t7   | |#21@21.d2.t8| |fn=(f2+f3).d2.t9|
  31. m60 product |#560.t6   | mbl |fn=d3.d2.t7   | |#21@22.d2.t8| |fn=(f2+f3).d2.t9|
  32.     ---------------------------------------------------------------------------
  33. totals      |t6        | mbl |t7            | |t8          | |t9              |
  34.  
  35.     ---------------------------------------------------------------------------
  36.                 total operating costs  (plant #1 & #2)       |t9              |
  37.  
  38.  
  39.                 products         volume           overall costs=mbbls
  40.  
  41.               m10 product    |#710.t10.e32 |        |#510=i$.e80   |
  42.               m30 product    |#730.t10.e32 |        |#530=i$.e80   |
  43.               m60 product    |#760.t10.e32 |        |#560=i$.e80   |
  44.  
  45.